I had a question about fire rating a chute discharge room, as specified in NFPA 82.
Per section 6.2.4.1.1, the discharge room is required to be the same rating as the shaft (in this case, 2 hours). Has anyone ever found an exception that allows the shaft to run to the slab (ie. the floor of the...