Confirm material grade and electrode for welding.
Chemical composition:
Fe 95.5
Cu 2.5
Cr 1.0
Mn 1.0
Chemical composition is result of key way of shaft
PMI.
Dear Reader,
Presently, we have identified defects in final fabricated heat exchanger. Please guide by mentioning the repair strategy of defect with exact reference of ASME Code / TEMA Code reference.
1. Few tubes ends are fused. (5mm Tubes are extended from tubesheet)
2. Pitting observed on...
Due to Re-tubing overall length of the exchanger will be reduced by 20mm, in order to compensate this tube sheet is of 38mm thickness instead of 28mm.
Please explain the effect of Heat exchanger design by this change and any evaluation is required. Can the increase in tubesheet thickness have...
Hello Reader,
I am looking for criteria/factors to be considered while creating new manway in a storage tank of acid. The tank is designed on API 650 and manufactured in 1958. The old man way is not safe with respect to size of opening and is at the top of tank. I am thinking to create new...