Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations SSS148 on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: JoeyX
  • Content: Threads
  • Order by date
  1. JoeyX

    Investigating and resolving low flow rate within a system

    I'm a recent graduate working for a chemical facility and would appreciate some insight on this problem I have a solvent being transferred from an IBC to a reactor (reactor 1). This transfer was found to be operating at a low flow rate of 1.5L/min. The designed flowrate is as 60L/min, how you...

Part and Inventory Search