Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations SDETERS on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. Sujitha Menon

    Stabilty index Q from Etabs

    Can anybody guide me on how to calculate the stabilty index value from Etabs output. As per ACI Q=(Σpux Δo)/Vusxl Σpu=total factored vertical load in the story being evaluated is it fine if I take the maximum vertical load derived from a DL/SDL/LL combination can Vus be the maximum reaction...
  2. Sujitha Menon

    Steel Bridge between buildings

    I am designing a bridge between 2 buildings. the The building is 7 stories and a 30m link bridge is required at level 3,4 5 and 6.between the buildings The building has expansion joint on one side of bridge which will be accommodated via a slotted connection on one side 1)Can I consider the...
  3. Sujitha Menon

    Can anyone guide me through design of waffle slab f (Sdl=7.1kpa and LL=15kpa)col spacing at 9.60m

    Hii all Can any one guide me to design a waffle slab supporting a water colled chiller area with (Sdl=7.1kpa and LL=15kpa)col spacing at 9.60m)
  4. Sujitha Menon

    Borehole depth

    how do we determine the depth of borehole under a tower building with 4 basement and 15 stories
  5. Sujitha Menon

    BoreHole depth determination

    Can anyone please guide on how to determine the bore hole depth for a building with 3 basements of 4.50m each +2m raft+15 floors above ground the raft comprises of 4 storey podiums and is divided by expansion koints I cannot consider the rule 1.50B as the width of raft is very huge water table...
  6. Sujitha Menon

    Steel framing for a 30m cantilever truss supporting 7 floors of hospital floor above

    Good Morning all Can you provide me your expert advice on the steel truss options Option-1 29m cantilver truss anchored to a stiff core (marked in pink and supports 7 floors of hospital above and the truss is 6m high Vierendeel truss and occupies 2 floor heights and trusses are spaced at 9.60m...
  7. Sujitha Menon

    Proposals to design a 50m cantilever transfer slab

    Good day This is for a project in Dubai where in I have a 50m cantilver edge at the corner of the building starting from 2nd floor and the building projects out to carry 10 floors of hospital above . what will be the best proposal to design this area.The General internal floor slabs are flat...
  8. Sujitha Menon

    ACI 318 19 Vs IBC

    Good day all The client is insisting is to use ACI 318-19 for one of our projects with IBC ACI 318-19 is referenced in IBC 2021 only and the same is not yet released can I explain to the client that I cannot use ACI 318-19 until itz referenced code is not released

Part and Inventory Search