I'm working in a design using a ductbank 3 x 4/0 XLPE with 4" PVC duct, but I can't find information about how I should Size de netral cable and where I shoul put it inside the ductbak.
The load is 3 Mw and the distance of ductbak is 3 miles.
The sistem depend of substation in start...
The module "Pulling Cable" of Etap only allowed -90 to 90 degrees to segment horizontal degrees.
What about more than 90 degrees?, for example 95 degrees, What I Should do in this...
Can someone tell me which radius of curvature to use if I have two underground segments ducts and that makes an angle using a manhole box instead of a pvc curve.
In this case, what degree of curvature should I use in the "Bend Radiuos" field requested by the "PULLING CABLE...