Hi,
I am currently designing a communication steel monopole composed of 4 tube sections. A 10 ft section of the top tube is currently failing under moment and would like to know what are the best and most common solutions to strengthening the section that is failing.
Thanks,
Hello,
I'm working on a foundation remediation for a communication concrete monopole. The proposed design would consist on adding a concrete ring around the existing concrete pole as shown in the drawing. We are currently working out the details regarding the connection between the existing...
Hello,
I am trying to model a 2 pc prestressed concrete Transmission pole using PLS-Pole Software. Based on the structure drawings I have a different GL moment for each of the concrete pole sections. The top section of the pole is 44ft long and has a GL moment of 523k-ft and the bottom section...
Hi,
I am currently working on foundation design project for a Transmission line (500kV) and the owner is proposing to construct a new concrete drilled shaft (6' in diameter) about 10ft away center-to-center from an abandoned shaft (6'in diameter). The shafts will not be connected by with a...