Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations SSS148 on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: jmmoncada
  • Content: Threads
  • Order by date
  1. jmmoncada

    Steel Monopole strengthening

    Hi, I am currently designing a communication steel monopole composed of 4 tube sections. A 10 ft section of the top tube is currently failing under moment and would like to know what are the best and most common solutions to strengthening the section that is failing. Thanks,
  2. jmmoncada

    Precast Concrete pole to Concrete Footing Connection Design

    Hello, I'm working on a foundation remediation for a communication concrete monopole. The proposed design would consist on adding a concrete ring around the existing concrete pole as shown in the drawing. We are currently working out the details regarding the connection between the existing...
  3. jmmoncada

    Modeling 2 PC Concrete Pole in PLS-Pole

    Hello, I am trying to model a 2 pc prestressed concrete Transmission pole using PLS-Pole Software. Based on the structure drawings I have a different GL moment for each of the concrete pole sections. The top section of the pole is 44ft long and has a GL moment of 523k-ft and the bottom section...
  4. jmmoncada

    Construction of a new drilled shaft next to an abandoned shaft

    Hi, I am currently working on foundation design project for a Transmission line (500kV) and the owner is proposing to construct a new concrete drilled shaft (6' in diameter) about 10ft away center-to-center from an abandoned shaft (6'in diameter). The shafts will not be connected by with a...

Part and Inventory Search