Dear All Piping and Stress Engineers,
Im currently designing an underground piping system of Firewater Network for an Oil and Gas Refinery, and their requirement is to use either GRE or HDPE pipe for it. I am stuck on the last part of selecting either this piping system shall be Stress Analyzed...
I recently stepped into designing of pressure vessels for an Oil and Gas Refinery, and was going through codes and engineering practices but was unable to find process requirements for Clad Vessels?
Is there any set of values of H2S mole percent, Sour Service, or minimum corrosion rate for...