Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: TSsouf
  • Content: Threads
  • Order by date
  1. TSsouf

    Level transmitter bridle design issue (connected on the line outlet vessel)

    The bottom tapping of the level bridle on hot oil vessel is connected to the suction line of the circulating pumps. When the pumps are not running both the trip transmitter and the indicating transmitter read approximately the same. When one of the pumps P321A/B/C is running this creates a...

Part and Inventory Search