  1. Maple2

    NEMA 7 or NEMA 4x Enclosure?

    I am currently inspecting a site for an upcoming CCTV project, and I found that they were using NEMA 4X enclosures in Class 1 Div 2 and Class 1 Div 1 areas of the site for some of the existing CCTVs. These enclosures house the electrical step-down transformers for CCTVs. However, I have some...
  2. Maple2

    HV Transformer Design for Apartment Residential Building

    Hi Gurus, For the first time, I want to design a 3ph HV utility transformer for an Apartment building with a switchboard rated for 120/208Y, 3000A, 65kA (AIC). Utility HV at proposed site is unknown. CEC 26-254 (2) stipulates that OCP is not needed on the Primary Side if secondary side has...
  3. Maple2

    Surge Protection Dilemma

    Hi Gurus, Im in a bit of a dilemma here and need your opinions. A Telecom client of mine is installing his facility in a Co-location building shared by another telecom company. They are not strangers, as they share space in other locations as well. Problem is, there was a thunder storm that...
  4. Maple2

    Transformer Over current protection

    Hi Gurus, I have heard conflicting opinions on selecting a Transformer OCP device rating. Problem is while CEC 26-26(2b) stipulates conductor size on Secondary side shall have ampacity rating of not less than 125% of rated Secondary current, some in my team are applying same rule to...
  5. Maple2

    Utility Pole Span Calculation

    Hello Gurus, Im working on my first powerline design. I want to design a private powerline extension (120/240V single ph, 30A) from an existing breaker panel in a residence to a proposed structure 150m away via overhead wooden poles in a rocky terrain. Whats the most comprehensive way to...
  6. Maple2

    How to Calculate Solar Panel & Battery

    Hi Gurus, I plan to power Three 30W LED Lights with Solar Panel for 10 hrs at most per night. Least average sunlight hours at location is 3 hrs (in Dec). This is my first Solar project and I would like to confirm if my Solar Panel and Battery selection calculations are fine: Total Load : 3 x...
  7. Maple2

    THE DILEMMA OF CLIMBING AM RADIO TOWERS

    Hi Gurus, Climbing a de-energized AM tower still poses a safety Hazard, as a colleague of mine found out recently. He got zapped by a Guye wire supports of a 'de-energized' AM tower he was climbing. Probably static charges due to the effects of coupling from another AM tower in operation...
  8. Maple2

    Data Loggers with Anti-Theft Features?

    Hello Gurus, Power Data loggers are quite expensive gadgets ($600 - $10K) to leave at a site's electrical room, in order to gather data. Wondering if there are those that come with anti-theft features, so far I couldn't find any. Thanks!
  9. Maple2

    ELECTRIC SERVICE AMPACITY OF A MULTI-DWELLING BUILDING

    Hi Gurus, How do you determine if a building has sufficient ampacity for new installations without getting the landlord involved? I am profoundly interested in his leasehold, but the landlord has no idea if his property has sufficient power, but need me to figure out without getting him...
  10. Maple2

    CONNECTING GENERATOR TO MAIN PANEL WITHOUT THE NEED FOR A SUBPANEL

    Hi gurus, Is there a way to connect a 100A generator via a 200A Manual Transfer Switch (MTS) to a 200A main electrical panel? The Gen is meant to power certain equipment only in the event of power failure. Are there special circuit breaker panels for this kind of purpose? Normally, I would...