When performing a insulation resistance test at 2500vdc on a piece of equipment the black lead is placed on ground or earth and the red is placed on the live part that you are measuring. A question was asked does it really matter if the leads are reversed and the ground lead is on the live part...
When we have a distribution transformer clear the system due to fault indications on the transformer, we test the cover gas head space before we perform any testing on the transformer. The gas tester tests for hydrogen and level is given out in percent LEL. What is your process for purging the...