Sorry for the lengthy description... The soil in our project was identified by our engineer to be Marlboro Clay and as such the engineer recommended that we over excavate the basement by 3 feet and install 2 feet of #3 stone and then 1 foot of #57 stone under the entire foundation. (1.5+...