  1. abdolmaleki1975

    SPLIT TEE

    Hello dear friends and experts; I have a few questions about Split Tee First, if the material of the main pipe body (pipeline) is API.5L.X60, can A 516 GR.70 sheet be used to make the split tee body? (of course calculated with a higher thickness) Second, for the split tee with the size of 40x16...
  2. abdolmaleki1975

    Mss standard compared to astm a860 wphy 52 standard

    Hello Can the mss standard replace the astm a860 standard for a 16-inch tee as the base material standard?
  3. abdolmaleki1975

    Distance between blowdown stacks in gas pressure boosting facilities

    Hello dear friends and experts; In a natural gas pressure boosting station, it is necessary to add a blowdown stack for emergency evacuation of the compressor station gases. While in the area there are two stacks of incoming pipelines (56 and 40 inches), so in order to locate the third stack, we...
  4. abdolmaleki1975

    Elbow cut 45 degrees to 27.5 degrees on a 10-inch branch of the pipeline

    Dear Friends I wanted to know if it is possible to cut a 45 degree elbow to 27.5 degrees in code ASME B.31.8. Is there anything in ASME B.31.8 about this? Is this allowed?