  1. 7788_011

    ACI dowel action in shear transfer

    In ACI 318-11 commentary, I have found the following in regard to dowel action in shear transfer, which is removed from ACI 318-19, in addition to shear friction. However, I am not getting why dowel action is expressed as AcK1 which has nothing to do with dowel bars? (I don't have reference...
  2. 7788_011

    Should I crack these transfer walls?

    Below is a section of the transfer structure I am working on. The transfer slab is going to be 400mm PT. I am getting large moment at the bottom of internal transferring walls as you can see from the picture below. Above is a 2D model but I have created a full 3D model and considered the...
  3. 7788_011

    Moment redistribution - Concrete Continuous Beams

    Given that for continuous concrete beams the moment generated at the supports will normally exceed the cracking moment Mcr of the beam, isn't it a must to increase the design bending moment & corresponding reinforcement at mid spans generated from a elastic frame analysis? Can anyone please...
  4. 7788_011

    Min length of precast panel next to opening?

    Is there any limit for the length of the precast panel legs next to opening? I have seen some people specify 600mm while some make it 300mm despite that their loads are quite close. I would argue that as long as the N-M satisfies (ligs provided if required) and there is no problem for...
  5. 7788_011

    How do I change the layout of this roof structure to reduce horizontal deflection due to wind

    Hello, Below is the plan view of roof structure for a residential jobs, which is 6m x 9.4m x 4m high. The yellow lines you are seeing is the c purlins @ 1200 cts while the blue ones are rafters. Wall bracings are placed under rafters and structs Now I have an horizontal deflection issue about...
  6. 7788_011

    Do I need another retaining wall here?

    I have this job that the ngl is higher than the ground floor and I am facing this issue that whether to add another retaining wall near the site boundary or not. Please see below. I am thinking cut & fill - batter the soil shown in purple and construct the piers. Then backfilling after the...