Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. TripleAYUDA

    Number of hours to design excavation project

    Dear all I would like to know from your experience the number of hours you put in to design an excavation project (less than 20m) assuming you have all geotechnical data, lab tests, and loads ready. thanks
  2. TripleAYUDA

    4000 kN lateral load on piles

    I am designing a pile foundation to support 8000 kN axial load + 4000 kN lateral load + 600 kN eccentricity moment. Piles are 1m in diameter and 23 meters deep Soil profile mostly clay: first 10 meters Su = 80kpa and the rest Su = 200 kpa and groundwater level at the surface; From analysis...
  3. TripleAYUDA

    Three column in one pile cap

    Dear all I am designing a pile foundation for a new building. the columns are closely spaced so I decided to place them on a single pile cap with a depth of about 1 meter, each column will transfer the load to the individual pile. The pile cap will also be connected with ground beams. Is...
  4. TripleAYUDA

    Owner geotechnical engineer problems

    Dear all I am the client's representative, working with a 2 story building that was initially designed to be supported on a shallow foundation, no geotechnical investigation was carried out and it was simply assumed that the ground is dense sand with an allowable bearing capacity of 100 kpa...

Part and Inventory Search