Good morning,
I hope you're doing well.
I am working on a project to replace a 24 m section of a damaged 12'' pipeline. this pipeline is buried and transports diesel. The point to be repaired is located 14 m from a shut-off valve. the other valve is located 30 km from the first. remember that...
Hi everybody,
We use three centrifugal pumps to transfer refined product through a 12" and 258 km pipeline. For a softer start-up, we want to install a VSD driver.
I wonder if there is an empiric formula to determine minimal flowrate in the function of pump rotational speed (like the law of...
Good morning,
Hope you are doing well
I work in refined product pipeline operations and I am looking for standards and guide for the use and removal of drag reduction agents.
Gilles