need to calculate the load for a cooling tunnel.
Line max speed is 800 kg/hr
Candy SKU ranging from 3.0g to 8.0g
15 Tr unit is already installed.
want to increase capacity for Dt (38c to 15c)
RH 30 to 35
need how much more Tr of capacity is required.
cooling time is 8 to 10 mins.
kindly...