Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: srm01
  • Content: Threads
  • Order by date
  1. srm01

    precast concrete beams/joist designations for late 50's to 60's construction

    Does anyone know if there are tables or information for precast concrete beams from the late 50's to 60' for I-beam shaped beams (not rectangular). Here is a typical designation on the old plans C.J. 14x4 .51/120 (it may also be 1.20 due to the quality of the plans) or C.J. 8 x 3-1/2 .22/.81 Or...
  2. srm01

    C&C roof positive pressure near parapet

    I am looking at the addition of a mechanical unit on a steel joist roof. The unit is resting on a steel beam on one long side of the unit and a joist on the other. ASCE7-22, Figure 30.3-2A, note 5 states there are different pressures near the parapets (see attached). The positive (downward)...
  3. srm01

    generator exhaust pipe running close to/touching concrete beam overhead

    I was at a jobsite yesterday and the generator exhaust pipe was running close to/touching the concrete beam overhead. See attached pictures. There is maybe 1/2" thick insulation wrap around the pipe. I have reviewed the Florida Building Code and NFPA37 for guidance on this and the most...
  4. srm01

    Nreq in Table 10-6 of AISC manual 13 ed.

    thread507-419698 just wanted to follow up on this thread. There is an equation for Nreq in Blodgett's Design of Welded Structures book. Page 5.2-2 equation (2): N = R/(t_w*(0.75*sigma_y))-K Do you think that equation is valid for Table 10-6?

Part and Inventory Search