Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: MechWang
  • Content: Threads
  • Order by date
  1. MechWang

    C&C roof mechanical louver doors

    Hello everyone, just being stumped with this one, I am trying to replace a mechanical room louver double door located at a 15 story building roof and my structural engineer propose a high negative design pressure (in the hundreds) which is very unusual for louver doors and per calculation using...
  2. MechWang

    Working on an MEP cooling tower replacement project

    Hello all, I am currently working on several cooling tower projects and would like to know how what is the process or what information should I provide, do I ask structural engineer to provide me a cost to review the existing structure, compare the existing and proposed cooling tower operating...
  3. MechWang

    Working on a multi discipline existing building project cooling tower

    Hello all, just wondering how is your experience working with other discipline particularly structural engineers. I am just sharing my experience, I have worked on several cooling tower projects now and none of them have been executed because structural team says my proposed tower is always...
  4. MechWang

    Cooling Tower Replacement

    Hello All, Newbie here, just want to get some expert advice, with regards to cooling tower replacement. Do you just get the same specs of the cooling tower and replace it same for same? or you still calculate the heat load of the building to compare to existing? second, when you change the...

Part and Inventory Search