Hi everyone,
I am trying to figure out whether PWHT (Post Weld Heat Treatment) is required per code for non-pressure parts welded to pressure parts under the following conditions:
The material is P1 Gr.1 for both the pressure part and non-pressure parts. PWHT is not required for service.
1)...
Hello everyone,
I am using ASME SEC VIII Div.2 rules per appendix 46 div.1 for nozzle reinforcement calculations in a Div.1 vessel. The nozzle is a custom forging (stub end) with a heavy barrel thickness thicker than the neck. Appendix 46-3(f) states, "Weld joint details shall be in accordance...