  1. James Bonding

    Frangibiliy Requirement for Dome Roof Tank

    Hi Everyone, Good Day! I have this tank project (8m Dia x 13.95 Height) Dome Roof Tank. My question is, Client requested to make it frangible connection. Does this applicable to this tank size? Roof to compression bar connection is as as per detail i of Fig F.2. Kindly help me on how to...
  2. James Bonding

    INSERT PLATE INPUT ON PV ELITE

    Hi I would like to seek your help. I am doing a design for caustic scrubber vessel. Before the vessel is using a reinforcing pad but now the client opted to change it to insert plate. The nozzle size is 16"and it's located on the cone section of the vessel. My question is how to consider the...
  3. James Bonding

    Design internal pressure is greater than maximum allowable working pressure (MAWP). AmeTANK ERROR.

    Hi sirs, I would like to seek your help. I am designing a Cone with internal floating roof tank which has a 22.94m ID x 14.52m H. Following information's also were indicated. Design Pressure = 250mmH20 + Full Liquid Design External Pressure = -60mmH20 Design Temp = 70 Deg C Liquid Stored =...