Dear ALL,
Our facility is oil/gas platform with equipped many fixed chemical day tanks/skids (it's used for injection chemical daily/continuously)
We're reviewing the need of flame arrestor for the tanks where located at hazardous area and almost chemicals are flammable liquid.
At the moment...
Hi ALL,
our gas processing has TEG generation system that required to check pH in lean TEG weekly.
the procedure to test pH of lean TEG as below:
PROCEDURE
4.3.1 Calibrate the meter, using the buffer solutions, in accordance with the manufacturer's
instruction manual.
4.3.2 Measure 11 ml of...