  1. Coca1995

    HART Communication with DVC6200

    For this specific project i got a DVC6200 that i want to communicate through HART. I am using Scadapack 474 and the expansion 6602 for it has 4 AO. My question is can i feed 4-20 mA to DVC 6200 as loop power and get the signal back from positioner in HART to the 6602 AI?
  2. Coca1995

    Sizing of a GSU

    How do you size a GSU? Lets say i have a generation plant DER with 15 MW capacity, the GSU size should be 15 MVA? Or is it always sized a bit higher than normal plant capacity?
  3. Coca1995

    Parallel buses

    For this particular project, i got three synchronous generator buses all working in parallel with three medium voltage generators on each bus. My question what kind of protection scheme would you need for such? This work will be done in two or three phase with second and third switchgear or...
  4. Coca1995

    What is Metering in SEL 700G? How d

    What is Metering in SEL 700G? How different is it from SEL 735?
  5. Coca1995

    Sizing an NGR

    I am using a 4.16 kV to 25 kV transformer at 5.6 MVA, 7% impedance Del, wye for my project. I want to size an NGR for this transformer. Thing is, 25 kV is too high for my standards and this is the first time i am working on it. My initial calculation for NGR gives 130A Earth fault current and...
  6. Coca1995

    Help with 4.16 kV switchgears

    Hey there, Do you guys know if any vendors that build or distribute Medium voltage 4.16 kV double bus bar system. I looked in Schneider but they have double bus bar system for 13kV+
  7. Coca1995

    MV Power plant

    Hey guys, Newbie eng here. Working on a powerplant design where we have 4 x2.5 MW, 4.16 kV generator and one backup generator which only operates when one of the 4 generator is down to achieve N-1 redundancy. Issue is i cant decide on which bus system to be used. Using a common bus seems more...