Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: JakeLong
  • Content: Threads
  • Order by date
  1. JakeLong

    ROCOF setting for industrial plant

    Hello, I'm working on a project regarding relay settings for an industrial plant, <10 MW. They are able to supply the plant fully through their syn. generator or through their connection to the grid, or a combination of both. It's been decided that they want ROCOF protection on their incomer...
  2. JakeLong

    Zero sequence impedance of cable

    I'm trying to calculate the zero sequence impedance of a cable for the calculation of single phase to ground fault and could use some clarification. The cable in question is 3x300/25mm² NA2XS2Y 6/10(12)kV, which there will be installed two of in parallel along with a 35mm² PE conductor. Is...

Part and Inventory Search