Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations IDS on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: Gopinath K
  • Content: Threads
  • Order by date
  1. Gopinath K

    difference between composite and multi segment pos tol in asme y14.5 2009

    Hi All Can any one explain exact difference between composite and multi-segment pos tolerance, is Multi segment used for refinement of uppersegment ? in both lower segment controls orientation and feature relation then what is the difference and how to choose which one to use with same datums...
  2. Gopinath K

    minimum wall thickness of the four holes to the O.D. of the part.

    can anyone explain easiest method to calculate min gap again i am confused with shift calculation https://files.engineering.com/getfile.aspx?folder=078cc01e-1d88-4869-9a84-3e4f5367781b&file=james-page504.PNG
  3. Gopinath K

    Axis to Axis calculation

    Hi can any one help on this attached axis to axis shift calculations ? i am aware virtual condition and resultant conditions but i had confusion on applying datum shift add or subtract ? long back i worked on stack up method now after a gap i had confused, please let me your ease way of...
  4. Gopinath K

    can we use total runout with projected tolerance zone?

    HI can we apply total runout with projected tolerance zone instead of position tolerance. while both ends of Outer diameters are A and B. how to measure projected tolerance with pos and runout plaese...

Part and Inventory Search