I cannot find any details or information on this, and I don't know if it's just never done, or if I'm just bad at finding information. We are looking at designing a pipe going into the weephole portion of a 48" concrete drywell, and I'm trying to figure out if that pipe penetration needs some...
This is a fairly typical task, but I can't find any good answers. I'm using the standard UPC tables 610.3 and 610.4 to determine required domestic water service and meter sizes. Those are sized based on WSFU's because it assumes some percentage of them are actually being utilized at a given...
Most of my projects in the past have been for private site developments, where we typically included all necessary notes on the plans and did not require separate specification books. Now, I am involved in new projects that require detailed specifications, which is a new area for our team. While...
I am for the first time looking at using a bioretention pond on one of my designs. I typically use proprietary systems or standard ponds for detention and treatment, but I would like to start utilizing LID's more for cost saving and potential utilization of the landscape areas. I have...
I have recently been looking into a project where an ash facility, where the limestone comes shipped in already wet, and also is exposed to precipitation. There was a stormwater collection "french drain" system installed a few years ago which, of course, already clogged, which was originally...