Hi, I'm currently working on the complete rehab of a 3 storey underground parking strucure in Canada that was built in 1970. The reason for the rehab is due to poor initial drainage (almost none). Over the years of being exposed to de-icing salt, the concrete is generally delaminated, the rebars...
I have recently been assigned a project involving the design of new bottom pin connections for sliding aircraft doors to replace some of the existing ones that are old and damaged. The doors are 48m long and 16m high, with articulated joints located at 1/3 and 2/3 of their length. Each...