We always combine reactions to a single point with excel and then put the reactions on RISAFoundation. I would like to know if it is possible combine two point coordinates into the same mat/slab foundation. Is there any differences between v15 and v16 besides the code?
Hi,
I am just wondering what're typical pier sizes for 4 ft and above? Do they all come in 6 in increments?
Is that normal to size pier diameter as 4' - 9" or 4' - 8"?
Hi everyone,
Long time looker, first time poster. How to analysis steel H-frame beam connection? I have a HSS beam with end plate bolted into wide flange web, and I wonder how should I analyze/design it as a full moment connection. I vaguely remember flange connection is full moment, and you...