Hello colleagues, I am designing an earthing grid for a 50 MVA power generation plant with 8 generators and two 25 kVA 34.5/13.8 kV Y-Y transformers with the neutral grounded on both sides, single-phase short circuit of 7 kA, and I have the following doubts if anyone would be so kind to help me...