Has anybody ever tried to build a sync feature in ETABS similar to the sync feature of REVIT? It is such a pain for multiple people to work on a same ETABS model simultaneously. I was wondering that if we could have a feature like sync in ETABS it would improve the overall efficiency by a lot...
Has anybody ever tried to build a sync feature in ETABS similar to the sync feature of REVIT? It is such a pain for multiple people to work on a same ETABS model simultaneously. I was wondering that if we could have a feature like sync in ETABS it would improve the overall efficiency by a lot...
I'm designing a transfer girder which has a tight deflection criteria and the depth of girder is restricted by some ARCH constrains. I'm wandering into a idea of using 3 identical parallel girders( transfer column sits on middle girder)to distribute the column loads and use the stiffness of all...