We have process skids and server areas that are in small, pre-fab buildings with simple HVAC.
The vendors are sizing conductors and servers based on the HVAC operating correctly. If HVAC fails then conductors will be undersized (overheat), servers and UPS may trip off, etc.
It's standard...