I was wondering if my HydroCAD model for stone check basins within a swale is correct.
I have a series of pond-reach-pond-reach-pond-reach... to model 16 check dams. However I do not know if I am doing the storage and outfall routing correct. For my ponds I have detention pond with custom stage...