Hello,
we are about to construct an embankment of about 14 meters high on approximately 2.0-2.5 meter clay layer, underneath the clay is a layer of gravel and a water level. The clay is contaminated with roots and the area is a part of a riverbed with very intense vegetation. Usually, we remove...