Hello everyone, hope you are fine. I am developing a model using PETREL, but i need the production curves until a production unit, i.e. flowing from the reservoir, going to the wellhead and a pipeline unitl a positioned production unit.
My doubt in this moment is if I am able to do this only...
Hello everyone, I would like to know the technical requirements used to phasing a exploration and production subsea project.
Which criteria to analyze to add, after start the first oil production, a separator, booster, compressor and so on?
Is it the water cut, decline curve?