I am designing a debris fence to be constructed across a channel at the downstream end of a rock energy dissipator. The fence is to be constructed with chain link fabric on heavy steel pipe posts. The fence will be 3 feet high to catch the first flush debris during a 5-yr to 10-yr storms and...