IAM ABOUT TO EMBARK ON A 3-4 MONTH PROJECT OF IDENTIFYING
ALL THE EQUIPTMENT/PIPING/ELECTRICAL SYSTEMS,ETC.
ANYONE HAVE INOVATIVE IDEAS FOR THIS PROCESS?
MY FIRST THOUGHT IS TO HAVE ID TAGS, THAT MAY BE HUNG FROM VALVES AND SO FORTH. CREATE SCHEMATICS/DRAWINGS TO COINCIDE WITH THE PIPING.
Folks,
Is anyone familure, with ,using wire baskets, filled with stone/old concrete, as a retaining wall? The existing cinder block is failing drastically. Also, with the described wire/stone construction, is there any need for drainage piping? Im wondering how large of a basket I will need to...