I have a real basic question. I'm in the utility industry, and mainly have dealt with 3phs 120/208, 3phs 277/480, or 1phs 120/240. Well now I'm dealing with open delta. I received load calcs from a new customer. Not believing their load summary, I'm attempting to pull out/calculate the...