  1. dhearn

    Contractor needs advice

    The Project: Building pad for a Reverse Osmosis and Brine Concentrator Water Treatment Plant. Strip 18” of native soil. Compact native soil subgrade to 95% Place +/- 2’ non expansive fill @ 95% Place wick drain blanket (12” drain rock between two layers of Mirafi 500X) Install wicks 5’ on...