The Project:
Building pad for a Reverse Osmosis and Brine Concentrator Water Treatment Plant.
Strip 18” of native soil.
Compact native soil subgrade to 95%
Place +/- 2’ non expansive fill @ 95%
Place wick drain blanket (12” drain rock between two layers of Mirafi 500X)
Install wicks 5’ on...