Hi all,
Initial imperfection (Do)is one of the most important steps to determine the bracing strength and stiffness requirements.
In the AISC 2005, and the number of Yura and Hewig papers show that Do=0.002Lb (Lb: unbraced length. However, this is based on the “full-bracing”- Winter’s model...