Four pipe lines of 4.000 m diameter and about 400 m long each is being installed for conveying sea water from NDCT to Condenser and back in a generating station. 12.0 m pipe lengths are field welded, encased in 250 mm thick RCC and buried underground. The contract requires hydro-static test at...