1st - A 150 / 50 Ton Overhead Crane Structure is dynamically loaded while in motion correct? If so, shouldn't the structure always be classified as dynamic, from the begining of design, fabrication, and erection?
2nd - As a follow up inspector for the sub-contractor I've found discrepancies from...