I recently stumbled upon a challenge in the construction site I am supervising. We are guided by two main drawings, 1) Tender drawings, 2) Shop drawings. The tender drawings indicate that there are two D.Bs each for a separate room in a specific building.
Unfortunately, there were no load...
Hi, I am new to this forum, and a fresh electrical eng. graduate. I currently work in the ministry of Housing Welfare , and all of our works are LV systems from 415v/240V S/S distributed to general buldings i.e schools, health centers and so on. I need some advice on this area.
There are...