For a warehouse slab foundation (200'x 90'), the columns are on the perimeter. The foundation will be 6" slab with 24"x36" perimeter beam.
The slab will be reinforced with #6 @ 12" oc both way with no contact joint. Is this a good option? or it would be better to design contact joint with less...