  1. borisng

    BOLTED BEAM TO BEAM ANGLE CONNECTIONS

    Dear Sir/ Madam, We have framing with beams W12x22 and W10x12. The web thk. of both of it 3/16". The same time we use double-angle ( (2)-L 4x3 1/2x5/16 )connections with wide gage 5 1/2". It seems to me we can not do it because max. spacing should be 3/16" x 24 = 4.5" and in that case we...
  2. borisng

    ASD - 6 kips LRFD - 10 kips for stair

    Dear Sir / Madam, Could you provide any comments about Minimum Strength of Connections according to: - ASD - it should be proportioned to 6 kips and - LRFD - it should be proportioned to 10 kips. How to use these norms for Stairs calculations and especially for: 1. tread's connections to...