I am looking for a good resourse to find a contract that can be used in an agreement between a structural engineer to provide professional services and a property owner.
I recently observed a 25 year old crawl space. The floor system was constructed of I-joists without designation markings spaced @ 19.2" o.c. Web blocking had not been installed at the time of construction at the ends or interior supports. Significant out of plane buckling has occurred since the...
I recently looked at a project where an existing simply supported 24'x12' suspended concrete slab had a chase cut in the short direction by a mechanical ductwork installer.
The slab is 5" thick with #3 bars @ 12" o.c in each direction. The reinforcing is located in the bottom of the slab. There...