Im interested in how people would tackle this problem / measure a tricky transition.
I have an outlet to a piece of equipment and the inlet to a piece of equipment downstream that need mating up with some duct / chute work.
The inlet is offset in all directions ie x,y,z.
Both the outlet and...
I am after some help on the design of a trolley. We are buying out a standard trolley which can hold up to 500kg. Weight of the trolley is 114. The load the trolley will be carrying is 410kg.
I have attached a picture below. As you can see the load is quite tall. We have worked out the Centre...