Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: MWB1
  • Content: Threads
  • Order by date
  1. MWB1

    fill overlying topsoil

    I have been testing a site with about 10' of mixed fill. Mostly a clay loam and loam mix. below the fill is about 2 feet of original topsoil (river flood plan) before reaching the inorganic alluvium. Total depth to the stiff alluvium is 14'. Does over-excavation sound like the best...

Part and Inventory Search