I have been testing a site with about 10' of mixed fill. Mostly a clay loam and loam mix. below the fill is about 2 feet of original topsoil (river flood plan) before reaching the inorganic alluvium. Total depth to the stiff alluvium is 14'. Does over-excavation sound like the best...