My subcontractor send a method statement for lifting and operating a clamshell using both main and auxiliary hooks of a crane simultaneously. Is it permitted by code or a standard practice?
Thank you in advance.
Want to lift a load of 86 ton in sea with a barge mounted crane. what is the in water load to be considered how to determine the capacity of the crane?