    moorings for fixed structures installation

    What are average periods which moorings for fixed structures such as wave devices, must be left for soil/sediment to settle, I have a source stating 1-6 months but no good information to back this up. I also wonder whether moorings are often installed in the winter when sea conditions are less...
  2. tf240

    mooring of floating structures

    This gives a review of wave device mooring systems, doesnt list them in relation to depth a seabed type, but gives you the key types. http://oreg.ca/web_documents/mooringsystems.pdf