I have a project where the owner wants us to prepare a LOMR based on an existing wall adjacent to a flood control channel. Part of the wall is a concrete masonry wall and part is a concrete panel wall. Therefore, I'm fairly sure this isn't a floodwall per FEMA Standards or COE regulations.
I...