Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. 799931

    ASCE 113 Update (2021)

    thread593-453773 Hello transmissiontowers - any word on when the update might roll out?
  2. 799931

    Miami Beach, Champlain Towers South apartment building collapse, Part 03

    The slab steel does look light but it's hard to say definitively. Is the implication that there aren't enough bars left going through the column? Bottom steel is missing? Something else? Even if the slab steel is light, I still struggle with why the failure occurred now and not in the first 40...
  3. 799931

    Miami Beach, Champlain Towers South apartment building collapse, Part 02

    If the engineers performing the assessment weren't able to identify a need to urgently evacuate building clearly the building official wouldn't have been able to either. His assessment of other buildings from a structural safety perspective is probably not relevant.
  4. 799931

    Miami Beach, Champlain Towers South apartment building collapse, Part 02

    Discussed above and agreed not relavant to collapse but just curious: Were they really counting on moment frame action between column & floor plate system? The shear walls do seem inadequate in the east west direction.
  5. 799931

    Miami Beach, Champlain Towers South apartment building collapse, Part 02

    Beam A is detailed on the top left of Lobby Level Framing Plan
  6. 799931

    Miami Beach, Champlain Towers South apartment building collapse

    https://www.espn.com/college-sports/story/_/id/31720961/uconn-huskies-pitcher-family-barely-escape-florida-building-collapse
  7. 799931

    Miami Beach, Champlain Towers South apartment building collapse

    It dropped minutes before the building went down, it was a contributing factor
  8. 799931

    Miami Beach, Champlain Towers South apartment building collapse

    I'm with sdh4 and dold.... the pool deck could have racked the columns along column line 9.1 That would explain the sudden collapse if several columns were able to fail nearly simultaneously
  9. 799931

    Miami Beach, Champlain Towers South apartment building collapse

    The planted column Ingenuity pointed out is interesting, it seems like it would take a few structrual irregularities like this to fail in order to bring a stucture down so quickly. Would be interesting to see if any of the damage/corrosion from the 2018 report affected any elements in that...
  10. 799931

    Miami Beach, Champlain Towers South apartment building collapse

    Where do the call out 100 kip driven piles? The PFI call out on S3 is for 300 kips
  11. 799931

    Miami Beach, Champlain Towers South apartment building collapse

    Looks like PFI - Pressure Injected Footings were the deep foundation system (S3 typical piling section) ? https://www.keller-na.com/expertise/techniques/franki-piles-pifs
  12. 799931

    ASCE 113 Update

    Hello transmissiontowers, Any chance the updated version of ASCE 113 has made it to peer review?
  13. 799931

    ASCE 113 Update

    Will the LRFD wind load factor match the ASCE 7 factor (1.0) or will it be something less like in the current version of ASCE 113 such as (1.2/1.6) ?
  14. 799931

    ASCE 113 Update

    Thanks for the update. Very curious to see if there will be an update to load combinations which address compatibility with wind speeds specified in ASCE 7-10 and later.
  15. 799931

    ASCE 113 Update

    Glad I didn't start holding my breath last time either!
  16. 799931

    ASCE 113 Update

    Hello transmissiontowers, I was just checking in to see if we might get an updated ASCE 113 this year. I copied a reply from an old thread below since they closed it: We have a meeting in Feb 2018 to look over committee comments and after that we have a spot on the agenda of the ETS conference...
  17. 799931

    Revision to ASCE 113 Substation Structural Design Guide

    Any word on this update? It in still on track for early 2018?
  18. 799931

    SE Exam Review Course - School of PE

    I'm looking for a good review course for the new 16 hour SE exam. It looks like the options are still pretty limited. So far I've found a Kaplan course (28 hrs) and a School of PE course (120 hrs), the only feedback I've come across said they were both decent and Kaplan generally received more...

Part and Inventory Search